Federal · Title 42 — Public Health and Welfare

42 U.S.C. § 17204: High cost region geothermal energy grant program

Read the full statutory text
a utility; an electric cooperative; a State; a political subdivision of a State; an Indian tribe; or a Native corporation. The term “high-cost region” means a region in which the average cost of electrical power or heat exceeds 150 percent of the national average retail cost, as determined by the Secretary. The Secretary shall use amounts made available to carry out this section to make grants to eligible entities for activities described in subsection (c). to conduct a feasibility study, including a study of exploration, geochemical testing, geomagnetic surveys, geologic information gathering, baseline environmental studies, well drilling, resource characterization, permitting, and economic analysis; for design and engineering costs, relating to the project; and to demonstrate and promote commercial application of technologies related to geothermal energy as part of the project. The cost-sharing requirements of section 16352 of this title shall apply to any project carried out under this section. Out of funds authorized under section 17202 of this title , there is authorized to be appropriated to carry out this section $5,000,000 for each of fiscal years 2021 through 2025.

Verify at the official source: Federal legislative text

Facing this? Know exactly what happens next.

MOFRD turns this code section into your situation: the deadlines that apply to you, the forms your county uses, and the resolution paths people in your position actually take. Free for 3 days — no card required.

This page is legal information, not legal advice. Code text is sourced from official publications and may lag amendments — always confirm at the official source linked above. Plain-English summaries and relationship data are AI-derived and reviewed on an ongoing basis; verify with a licensed attorney before acting.