Federal · Title 33 — Navigation and Navigable Waters

33 U.S.C. § 2347c: Small water storage projects

Read the full statutory text
The Secretary shall carry out a program to study and construct new, or enlarge existing, small water storage projects, in partnership with a non-Federal interest. in the case of a new small water storage project, have a water storage capacity of not less than 2,000 acre-feet and not more than 30,000 acre-feet; in the case of an enlargement of an existing small water storage project, be for an enlargement of not less than 1,000 acre-feet and not more than 30,000 acre-feet; flood risk management benefits; ecological benefits; or water management, water conservation, or water supply; and economically justified, environmentally acceptable, and technically feasible; or in the case of a project providing ecological benefits, cost-effective with respect to such benefits. In carrying out the program under this section, the Secretary shall give preference to a small water storage project located in a State with a population of less than 1,000,000. For the 10-year period beginning on December 27, 2020 , the Secretary shall expedite small water storage projects under this section for which applicable Federal permitting requirements have been completed. as the Secretary determines appropriate, consider and utilize any applicable hydrologic, economic, or environmental data that is prepared for a small water storage project under State law as the documentation, or part of the documentation, required to complete State water plans or other State planning documents relating to water resources management; and consider information developed by the non-Federal interest in relation to another study, to the extent the Secretary determines such information is applicable, appropriate, or otherwise authorized by law. 100 percent for costs not to exceed $100,000; and 50 percent for any costs above $100,000. municipal and industrial water supply: 100 percent non-Federal; agricultural water supply: 35 percent non-Federal; and recreation, including recreational navigation: 50 percent of separable costs and, in the case of any harbor or inland harbor or channel project, 50 percent of joint and separable costs allocated to recreational navigation. The costs of operation, maintenance, repair, and replacement and rehabilitation for a small water storage project constructed under this section shall be the responsibility of the non-Federal interest. Not more than $65,000,000 in Federal funds may be made available to a small water storage project under this section. There is authorized to be appropriated to carry out this section $130,000,000 annually through fiscal year 2030.

Verify at the official source: Federal legislative text

Facing this? Know exactly what happens next.

MOFRD turns this code section into your situation: the deadlines that apply to you, the forms your county uses, and the resolution paths people in your position actually take. Free for 3 days — no card required.

This page is legal information, not legal advice. Code text is sourced from official publications and may lag amendments — always confirm at the official source linked above. Plain-English summaries and relationship data are AI-derived and reviewed on an ongoing basis; verify with a licensed attorney before acting.