Federal · Title 33 — Navigation and Navigable Waters

33 U.S.C. § 2282g: Scope of feasibility studies

Read the full statutory text
a riverine discharge of any magnitude or frequency; inundation, wave attack, and erosion coinciding with a hurricane or coastal storm; flooding associated with tidally influenced portions of rivers, bays, and estuaries that are hydrologically connected to the coastal water body; a rainfall event of any magnitude or frequency; a tide of any magnitude or frequency; seasonal variation in water levels; groundwater emergence; sea level rise; subsidence; or any other driver of flood risk affecting the area within the geographic scope of the study. to maximize combined net benefits for the primary purpose of the study and for the purposes of water supply or water conservation (including the use of water supply conservation measures described in section 1116 of the Water Resources Development Act of 2016 ( 130 Stat. 1639 )); or to include 1 or more measures for the purposes of water supply or water conservation if the Secretary determines that such measures may reduce potential adverse impacts of extreme weather events, including drought, on water resources within the geographic scope of the study. All costs to carry out a feasibility study in accordance with this section shall be shared in accordance with the cost share requirements otherwise applicable to the study.

Verify at the official source: Federal legislative text

Facing this? Know exactly what happens next.

MOFRD turns this code section into your situation: the deadlines that apply to you, the forms your county uses, and the resolution paths people in your position actually take. Free for 3 days — no card required.

This page is legal information, not legal advice. Code text is sourced from official publications and may lag amendments — always confirm at the official source linked above. Plain-English summaries and relationship data are AI-derived and reviewed on an ongoing basis; verify with a licensed attorney before acting.