Federal · Title 33 — Navigation and Navigable Waters

33 U.S.C. § 2282: Feasibility reports

Read the full statutory text
In the case of any water resources project-related study authorized to be undertaken by the Secretary that results in recommendations concerning a project or the operation of a project and that requires specific authorization by Congress in law or otherwise, the Secretary shall prepare a feasibility report, subject to section 2215 of this title . A feasibility report shall describe, with reasonable certainty, the economic, environmental, and social benefits and detriments of the recommended plan and alternative plans considered by the Secretary and the engineering features (including hydrologic and geologic information), the public acceptability, and the purposes, scope, and scale of the recommended plan. A feasibility report shall also include the views of other Federal agencies and non-Federal agencies with regard to the recommended plan, a description of a nonstructural alternative to the recommended plan when such plan does not have significant nonstructural features, and a description of the Federal and non-Federal participation in such plan, and shall demonstrate that States, other non-Federal interests, and Federal agencies have been consulted in the development of the recommended plan. A feasibility report shall include a preliminary analysis of the Federal interest and the costs, benefits, and environmental impacts of the project. any study with respect to which a report has been submitted to Congress before November 17, 1986 ; any study for a project, which project is authorized for construction by this Act and is not subject to section 903(b); 1 1 See References in Text note below. any study for a project which does not require specific authorization by Congress in law or otherwise; and general studies not intended to lead to recommendation of a specific water resources project. In this subsection, the term “feasibility report” means each feasibility report, and any associated environmental impact statement and mitigation plan, prepared by the Corps of Engineers for a water resources project. The term includes a project implementation report prepared under title VI of the Water Resources Development Act of 2000 ( 114 Stat. 2680–2694 ), a general reevaluation report, and a limited reevaluation report. an economically disadvantaged community (as defined by the Secretary under section 160 of the Water Resources Development Act of 2020 ( 33 U.S.C. 2201 note)); or a community other than a community described in subclause (I); and that are designated as a new start under the work plan. After identifying the studies under subparagraph (A) and subject to subparagraph (C), the Secretary shall, with the consent of the applicable non-Federal interest for the study, first determine the Federal interest in carrying out the study and the projects that may be proposed in the study. The Secretary may make a determination under clause (i) prior to the execution of a feasibility cost share agreement between the Secretary and the non-Federal interest. For each fiscal year, the Secretary may not make a determination under subparagraph (B) for more than 20 studies identified under subparagraph (A)(i)(II). Subject to clause (ii) and with the consent of the non-Federal interest, the Secretary may use the authority provided under this subsection for a study in a work plan submitted to Congress prior to January 4, 2025 , if the study otherwise meets the requirements described in subparagraph (A). Subparagraph (C) shall apply to the use of authority under clause (i). shall be at Federal expense; shall not exceed $300,000; and shall be paid from the funding provided for the study in the applicable work plan described in that paragraph. A determination under paragraph (1) shall be completed by not later than 120 days after the date on which funds are made available to the Secretary to carry out the determination. The cost of a determination under paragraph (1) shall not be included for purposes of the maximum total cost under section 2282c(a)(2) of this title . If, based on a determination under paragraph (1), the Secretary determines that a study or project is not in the Federal interest because the project will not result, or is unlikely to result, in a recommended plan that will produce national economic development benefits greater than cost, but may result in a technically sound and environmentally acceptable plan that is otherwise consistent with section 2281 of this title , the Secretary shall issue a report to the non-Federal interest with recommendations on how the non-Federal interest might modify the proposal such that the project could be in the Federal interest and feasible. A study under this section shall continue after a determination under paragraph (1)(B)(i) without a new investment decision. In the case of any water resources project-related study authorized to be undertaken by the Secretary without specific authorization by Congress in law or otherwise, the Secretary shall prepare a detailed project report. For purposes of studies undertaken pursuant to this section, the Secretary is authorized to consider benefits which may accrue to Indian tribes as a result of a project resulting from such a study. The Secretary shall undertake such measures as are necessary to ensure that standard and uniform procedures and practices are followed by each district office (and each division office for any area in which there is no district office) of the United States Army Corps of Engineers in the preparation of feasibility reports on water resources projects. The Secretary shall establish procedures to enhance public participation in the development of each feasibility study under subsection (a), including, if appropriate, establishment of a stakeholder advisory group to assist the Secretary with the development of the study. If the Secretary provides for the establishment of a stakeholder advisory group under this subsection, the membership of the advisory group shall include balanced representation of social, economic, and environmental interest groups, and such members shall serve on a voluntary, uncompensated basis. Procedures established under this subsection shall not delay development of any feasibility study under subsection (a). Not later than 180 days after June 10, 2014 , the Secretary shall determine a set of milestones needed for the completion of a feasibility study under this subsection, including all major actions, report submissions and responses, reviews, and comment periods. Each District Engineer shall, to the maximum extent practicable, establish a detailed project schedule, based on full funding capability, that lists all deadlines for milestones relating to feasibility studies in the District developed by the Secretary under paragraph (1). for projects that have received funding from the General Investigations Account of the Corps of Engineers in the period beginning on October 1, 2009 , and ending on June 10, 2014 , not later than 180 days after the establishment of milestones under paragraph (1); and for projects for which a feasibility cost-sharing agreement is executed after the establishment of milestones under paragraph (1), not later than 90 days after the date on which the agreement is executed. submit an annual report that lists all detailed project schedules under paragraph (2) and an explanation of any missed deadlines to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives; and make publicly available, including on the Internet, a copy of the annual report described in subparagraph (A) not later than 14 days after date 2 on which a report is submitted to Congress. 2 So in original. Probably should be preceded by “the”. why the District Engineer failed to meet the deadline; and a revised project schedule reflecting amended deadlines for the feasibility study; and not later than 30 days after each missed deadline, make publicly available, including on the Internet, a copy of the amended project schedule described in subparagraph (A)(ii). expedite the completion of any on-going feasibility study for a project initiated before the date of enactment of this Act [ June 10, 2014 ]; and if the Secretary determines that the project is justified in a completed report, proceed directly to preconstruction planning, engineering, and design of the project in accordance with section 910 of the Water Resources Development Act of 1986 ( 33 U.S.C. 2287 ).” The term ‘Academy’ means the National Academy of Sciences. The term ‘method’ means a method, model, assumption, or other pertinent planning tool used in conducting an economic or environmental analysis of a water resources project, including the formulation of a feasibility report. The term ‘feasibility report’ means each feasibility report, and each associated environmental impact statement and mitigation plan, prepared by the Corps of Engineers for a water resources project. The term ‘water resources project’ means a project for navigation, a project for flood control, a project for hurricane and storm damage reduction, a project for emergency streambank and shore protection, a project for ecosystem restoration and protection, and a water resources project of any other type carried out by the Corps of Engineers. Not later than 90 days after the date of enactment of this Act [ Dec. 11, 2000 ], the Secretary [of the Army] shall contract with the Academy to study, and make recommendations relating to, the independent peer review of feasibility reports. the cost, time requirements, and other considerations relating to the implementation of independent peer review; and objective criteria that may be used to determine the most effective application of independent peer review to feasibility reports for each type of water resources project. the results of the study conducted under paragraphs (1) and (2); and in light of the results of the study, specific recommendations, if any, on a program for implementing independent peer review of feasibility reports. There is authorized to be appropriated to carry out this subsection $1,000,000, to remain available until expended. a review of state-of-the-art methods; a review of the methods currently used by the Secretary; a review of a sample of instances in which the Secretary has applied the methods identified under subparagraph (B) in the analysis of each type of water resources project; and a comparative evaluation of the basis and validity of state-of-the-art methods identified under subparagraph (A) and the methods identified under subparagraphs (B) and (C). the results of the study conducted under paragraph (1); and in light of the results of the study, specific recommendations for modifying any of the methods currently used by the Secretary for conducting economic and environmental analyses of water resources projects. There is authorized to be appropriated to carry out this subsection $2,000,000. Such sums shall remain available until expended.”

Verify at the official source: Federal legislative text

Facing this? Know exactly what happens next.

MOFRD turns this code section into your situation: the deadlines that apply to you, the forms your county uses, and the resolution paths people in your position actually take. Free for 3 days — no card required.

This page is legal information, not legal advice. Code text is sourced from official publications and may lag amendments — always confirm at the official source linked above. Plain-English summaries and relationship data are AI-derived and reviewed on an ongoing basis; verify with a licensed attorney before acting.