Federal · Title 33 — Navigation and Navigable Waters

33 U.S.C. § 2280: Maximum cost of projects

Read the full statutory text
may be increased by the Secretary for modifications which do not materially alter the scope or functions of the project as authorized, but not by more than 20 percent of the total cost stated for the project in this Act, in any later law, or in an amendment made by this Act or any later law; and changes in construction costs applied to unconstructed features (including real property acquisitions, preconstruction studies, planning, engineering, and design) from the date of enactment of this Act or any later law (unless otherwise specified) as indicated by engineering and other appropriate cost indexes; and additional studies, modifications, and actions (including mitigation and other environmental actions) authorized by this Act or any later law or required by changes in Federal law. Notwithstanding subsection (a), in accordance with section 701h of this title , the Secretary may accept funds from a non-Federal interest for any authorized water resources development project that has exceeded its maximum cost under subsection (a), and use such funds to carry out such project, if the use of such funds does not increase the Federal share of the cost of such project. defer the initiation or continuation of construction of the water resources development project during the covered period; or terminate during or after the covered period, a contract for design or construction of the water resources development project that was entered into prior to or during the covered period. The Secretary shall, upon the transmittal of an initial notification pursuant to subsection (b)(1) with respect to a water resources development project for which construction was deferred, during the period beginning on October 1, 2021 , and ending on the date of enactment of this Act [ Dec. 23, 2022 ], because the cost of such project exceeded the maximum cost permitted under section 902 of the Water Resources Development Act of 1986 ( 33 U.S.C. 2280 ), resume construction of the project. Not later than 30 days after the Chief of Engineers makes a determination that a water resources development project exceeds, or is expected to exceed, the maximum cost of the project permitted under section 902 of the Water Resources Development Act of 1986 ( 33 U.S.C. 2280 ), the Chief of Engineers shall transmit a written notification concurrently to the Secretary and to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives for each such determination. an estimate of the expected increase in the cost of the project that is in excess of the authorized maximum cost for the project; a description of the reason for the increased cost of the project; and the expected timeline for submission of a post-authorization change report for the project in accordance with section 1132 of the Water Resources Development Act of 2016 ( 33 U.S.C. 2282e ). The notifications described in paragraphs (1) and (2) may not be delayed as a result of consideration being given to changes in policy or priority with respect to project consideration. After expiration of the covered period, the Secretary shall not enter into any new contract, or exercise any option in a contract, for construction of a water resources development project if the project exceeds the maximum cost of the project permitted under section 902 of the Water Resources Development Act of 1986 ( 33 U.S.C. 2280 ), until the date on which Congress authorizes an increase in the cost of the project. Nothing in this section waives the obligation of the Secretary to submit to the Committee on Environment and Public Works of the Senate and the Committee on Transportation and Infrastructure of the House of Representatives a post-authorization change report recommending an increase in the authorized cost of a project if the project otherwise would exceed the maximum cost of the project permitted under section 902 of the Water Resources Development Act of 1986 ( 33 U.S.C. 2280 ). In this section, the term ‘covered period’ means the period beginning on the date of enactment of this Act [ Dec. 23, 2022 ] and ending on December 31, 2024 .”

Verify at the official source: Federal legislative text

Facing this? Know exactly what happens next.

MOFRD turns this code section into your situation: the deadlines that apply to you, the forms your county uses, and the resolution paths people in your position actually take. Free for 3 days — no card required.

This page is legal information, not legal advice. Code text is sourced from official publications and may lag amendments — always confirm at the official source linked above. Plain-English summaries and relationship data are AI-derived and reviewed on an ongoing basis; verify with a licensed attorney before acting.