Federal · Title 16 — Conservation

16 U.S.C. § 838n: Columbia Basin power management

Read the full statutory text
The term “Account” means the account established by subsection (b)(1). The term “Administrator” means the Administrator of the Bonneville Power Administration. The term “Canadian Entitlement” means the downstream power benefits that Canada is entitled to under Article V of the Treaty Relating to Cooperative Development of the Water Resources of the Columbia River Basin, signed at Washington January 17, 1961 (15 UST 1555; TIAS 5638). There is established in the Treasury an account for the purposes of making expenditures to increase bilateral transfers of renewable electric generation between the western United States and Canada. The Administrator may make expenditures from the Account for activities to improve electric power system coordination by constructing electric power transmission facilities within the western United States that directly or indirectly facilitate non-carbon emitting electric power transactions between the western United States and Canada. September 16, 2024 ; and the date on which the Canadian entitlement value calculation is terminated or reduced to the actual electric power value to the United States, as determined by the Administrator. The Administrator shall consult with relevant electric utilities in Canada and appropriate regional transmission planning organizations in considering the construction of transmission activities under this subsection. There is authorized to be appropriated to the Account a nonreimburseable amount equal to the aggregated amount of the Canadian Entitlement during the 5-year period preceding November 15, 2021 . to replace obsolete equipment; to maintain reliability and improve efficiency in system performance and operation; to create more hydroelectric power capacity in the Pacific Northwest; and to ensure the availability of water for irrigation in the event that Columbia River water flows from British Columbia into the United States are insufficient after September 16, 2024 . There is authorized to be appropriated $100,000,000, which shall be nonreimburseable, to carry out this subsection. The Administrator shall conduct a study considering the potential hydroelectric power value to the Pacific Northwest of increasing the coordination of the operation of hydroelectric and water storage facilities on rivers located in the United States and Canada. projected changes to the Pacific Northwest electricity supply; potential reductions in greenhouse gas emissions; any potential need to increase transmission capacity; and any other factor the Administrator considers to be relevant for increasing bilateral coordination. the 1 British Columbia or a crown corporation owned by British Columbia; 1 So in original. The word “the” probably should not appear. the Assistant Secretary; the Commissioner of Reclamation; and any public utility districts that operate hydroelectric projects on the mainstem of the Columbia River. There is authorized to be appropriated $10,000,000, which shall be nonreimburseable, to carry out this subsection.

Verify at the official source: Federal legislative text

Facing this? Know exactly what happens next.

MOFRD turns this code section into your situation: the deadlines that apply to you, the forms your county uses, and the resolution paths people in your position actually take. Free for 3 days — no card required.

This page is legal information, not legal advice. Code text is sourced from official publications and may lag amendments — always confirm at the official source linked above. Plain-English summaries and relationship data are AI-derived and reviewed on an ongoing basis; verify with a licensed attorney before acting.