Federal · Title 10 — Armed Forces
10 U.S.C. § 6114: Nuclear weapons stockpile stewardship, management, and responsiveness plan
Read the full statutory text
The Administrator, in consultation with the Secretary of Defense and other appropriate officials of the departments and agencies of the Federal Government, shall develop and annually update a plan for sustaining the nuclear weapons stockpile. The plan shall cover, at a minimum, stockpile stewardship, stockpile management, stockpile responsiveness, stockpile surveillance, program direction, infrastructure modernization, human capital, and nuclear test readiness. The plan shall be consistent with the programmatic and technical requirements of the most recent annual Nuclear Weapons Stockpile Memorandum. In accordance with subsection (c), not later than 45 days after each date on which a budget for an odd-numbered fiscal year is submitted to Congress, the Administrator shall submit to the congressional defense committees a detailed report on the plan developed under subsection (a). The report required by this subsection shall be submitted in unclassified form, but may include a classified annex. the status of the nuclear weapons stockpile, including the number and age of warheads (including both active and inactive) for each warhead type; the planned number of nuclear warheads (including active and inactive) for each warhead type in the nuclear weapons stockpile; and the past and projected future total lifecycle cost of each type of nuclear weapon; the status, plans, budgets, and schedules for warhead life extension programs and any other programs to modify, update, or replace warhead types; a description of the process by which the Administrator assesses the lifetimes, and requirements for life extension or replacement, of the nuclear and non-nuclear components of the warheads (including active and inactive warheads) in the nuclear weapons stockpile; a description of the process used in recertifying the safety, security, and reliability of each warhead type in the nuclear weapons stockpile; any concerns of the Administrator that would affect the ability of the Administrator to recertify the safety, security, or reliability of warheads in the nuclear weapons stockpile (including active and inactive warheads); mechanisms to provide for the manufacture, maintenance, and modernization of each warhead type in the nuclear weapons stockpile, as needed; mechanisms to expedite the collection of information necessary for carrying out the stockpile management program required by section 6116, including information relating to the aging of materials and components, new manufacturing techniques, and the replacement or substitution of materials; mechanisms to ensure the appropriate assignment of roles and missions for each national security laboratory and nuclear weapons production facility, including mechanisms for allocation of workload, mechanisms to ensure the carrying out of appropriate modernization activities, and mechanisms to ensure the retention of skilled personnel; mechanisms to ensure that each national security laboratory has full and complete access to all weapons data to enable a rigorous peer-review process to support the annual assessment of the condition of the nuclear weapons stockpile required under section 6117; mechanisms for allocating funds for activities under the stockpile management program required by section 6116, including allocations of funds by weapon type and facility; for each of the five fiscal years following the fiscal year in which the report is submitted, an identification of the funds needed to carry out the program required under section 6116; the status, plans, activities, budgets, and schedules for carrying out the stockpile responsiveness program under section 6131; for each of the five fiscal years following the fiscal year in which the report is submitted, an identification of the funds needed to carry out the program required under section 6131; and as required, when assessing and developing prototype nuclear weapons of foreign countries, a report from the directors of the national security laboratories on the need and plan for such assessment and development that includes separate comments on the plan from the Secretary of Energy and the Director of National Intelligence. a description of the information needed to determine that the nuclear weapons stockpile is safe and reliable; for each science-based tool used to collect information described in subparagraph (A), the relationship between such tool and such information and the effectiveness of such tool in providing such information based on the criteria developed pursuant to section 6113(a); and the criteria developed under section 6113(a) (including any updates to such criteria). any key technical challenges to the stockpile stewardship program; and the strategies to address such challenges without the use of nuclear testing; a strategy for using the science-based tools (including advanced simulation and computing capabilities) of each national security laboratory to ensure that the nuclear weapons stockpile is safe, secure, and reliable without the use of nuclear testing; an assessment of the science-based tools (including advanced simulation and computing capabilities) of each national security laboratory that exist at the time of the assessment compared with the science-based tools expected to exist during the period covered by the future-years nuclear security program; and the number of scientists, engineers, and technicians, by discipline, required to maintain such competencies; and a description of any shortage of such individuals that exists at the time of the assessment compared with any shortage expected to exist during the period covered by the future-years nuclear security program. the national security strategy of the United States as set forth in the most recent national security strategy report of the President under section 108 of the National Security Act of 1947 ( 50 U.S.C. 3043 ) if such strategy has been submitted as of the date of the plan; the most recent national defense strategy as of the date of the plan; and the most recent Nuclear Posture Review as of the date of the plan; an explanation of the targeted needs addressed by the measures described under subparagraph (A); a schedule for implementing the measures described under subparagraph (A) during the 10-year period following the date of the plan; a summary of identified long-term infrastructure investments needed beyond such 10-year period; a statement of changes to, and progress toward achieving, the measures described under subparagraph (A) during the period covered by the report, compared to such changes and progress during the period covered by the preceding report; the estimated levels of annual funds the Administrator determines necessary to carry out the measures described under subparagraph (A), including a discussion of the criteria, evidence, and strategies on which such estimated levels of annual funds are based; and the metrics (based on industry best practices) used by the Administrator to determine the infrastructure deferred maintenance and repair needs of the nuclear security enterprise; and the percentage of replacement plant value being spent on maintenance and repair needs of the nuclear security enterprise; and an explanation of whether the annual spending on such needs complies with the recommendation of the National Research Council of the National Academies of Sciences, Engineering, and Medicine that such spending be in an amount equal to four percent of the replacement plant value, and, if not, the reasons for such noncompliance and a plan for how the Administrator will ensure facilities of the nuclear security enterprise are being properly sustained. an estimate of the period of time that would be necessary for the Administrator to conduct an underground test of a nuclear weapon once directed by the President to conduct such a test; a description of the level of test readiness that the Administrator, in consultation with the Secretary of Defense, determines to be appropriate; a list and description of the workforce skills and capabilities that are essential to carrying out an underground nuclear test at the Nevada National Security Site; a list and description of the infrastructure and physical plants that are essential to carrying out an underground nuclear test at the Nevada National Security Site; and an assessment of the readiness status of the skills and capabilities described in subparagraph (C) and the infrastructure and physical plants described in subparagraph (D). An assessment of the baseline science issues necessary to understand plutonium aging under static and dynamic conditions under manufactured and nonmanufactured plutonium geometries. An assessment of scientific and testing instrumentation for plutonium at elemental and bulk conditions. An assessment of manufacturing and handling technology for plutonium and plutonium components. An assessment of computational models of plutonium performance under static and dynamic loading, including manufactured and nonmanufactured conditions. An identification of any capability gaps with respect to the assessments described in subparagraphs (A) through (D). An estimate of costs relating to the issues, instrumentation, technology, and models described in subparagraphs (A) through (D) over the period covered by the future-years nuclear security program under section 3253 of the National Nuclear Security Administration Act ( 50 U.S.C. 2453 ). An estimate of the cost of eliminating the capability gaps identified under subparagraph (E) over the period covered by the future-years nuclear security program. Such other items as the Administrator considers important for the integrated management of plutonium for stockpile and stockpile stewardship needs. for each site in the nuclear security enterprise, a description of the technologies deployed to address the physical and cybersecurity threats posed to that site; for each site and for the nuclear security enterprise, the methods used by the Administration to establish priorities among investments in physical and cybersecurity technologies; and a detailed description of how the funds identified for each program element specified pursuant to paragraph (1) in the budget for the Administration for each fiscal year during that five-fiscal-year period will help carry out that plan. An assessment of whether the programs described by the report can be executed with current and projected budgets and any associated risks. Identification of any modifications or updates to the plan since the previous summary or 1 detailed report was submitted under subsection (b). 1 So in original. The words “summary or” probably should not appear. whether the plan supports the requirements of the national security strategy of the United States referred to in subsection (d)(4)(A)(i), 2 the most recent the national defense strategy, and the most recent Nuclear Posture Review; 2 See References in Text note below. whether the modernization and refurbishment measures described under subparagraph (A) of subsection (d)(4) 2 and the schedule described under subparagraph (B) of such subsection 2 are adequate to support such requirements; and whether the plan supports the stockpile responsiveness program under section 6131 in a manner that meets the objectives of such program and an identification of any improvements that may be made to the plan to better carry out such program. An analysis of whether the plan adequately addresses the requirements for infrastructure recapitalization of the facilities of the nuclear security enterprise. supporting the annual certification of the nuclear weapons stockpile; and maintaining the long-term safety, security, and reliability of the nuclear weapons stockpile. Not later than 180 days after the date on which the Administrator submits the plan under subsection (b)(1), the Nuclear Weapons Council shall submit to the congressional defense committees a report detailing the assessment required under paragraph (1). The term “budget”, with respect to a fiscal year, means the budget for that fiscal year that is submitted to Congress by the President under section 1105(a) of title 31 . The term “future-years nuclear security program” means the program required by section 3253 of the National Nuclear Security Administration Act ( 50 U.S.C. 2453 ). The term “national defense strategy” means the review of the defense programs and policies of the United States that is carried out every four years under section 113(g). The term “nuclear security budget materials”, with respect to a fiscal year, means the materials submitted to Congress by the Administrator in support of the budget for that fiscal year. The term “weapons activities” means each activity within the budget category of weapons activities in the budget of the Administration. nuclear nonproliferation; nuclear forensics; nuclear intelligence; nuclear safety; and nuclear incident response. The amendment to section 4203 of the Atomic Energy Defense Act ([former] 50 U.S.C. 2523 ) made by section 3122 [probably should be “3121”] shall be executed with respect to section 6114 of title 10 , United States Code, as added by subsection (a). The amendment to section 4219 of the Atomic Energy Defense Act ([former] 50 U.S.C. 2358a [probably should be “2538a”]) made by section 3112 shall be executed with respect to section 6128 of title 10 , United States Code, as added by subsection (a). The amendment to section 4220(c) of the Atomic Energy Defense Act ([former] 50 U.S.C. 2538b ) made by section 3113 shall be executed with respect to section 6131 of title 10 , United States Code, as added by subsection (a). The amendment to subtitle A of title XLII of the Atomic Energy Defense Act ([former] 50 U.S.C. 2521 et seq.) made by section 3113 shall be executed with respect to subchapter I of chapter 602 of title 10, United States Code, as added by subsection (a). The amendment to section 4510 of the Atomic Energy Defense Act ([former] 50 U.S.C. 2661 ) made by section 3114 shall be executed with respect to section 6227 of title 10 , United States Code, as added by subsection (a). The amendment to section 4601 of the Atomic Energy Defense Act ([former] 50 U.S.C. 2701 ) made by section 3115 shall be executed with respect to section 6241 of title 10 , United States Code, as added by subsection (a). The amendment to section 4713 of the Atomic Energy Defense Act ([former] 50 U.S.C. 2753 ) made by section 3116 shall be executed with respect to section 6284 of title 10 , United States Code, as added by subsection (a). The amendment to subtitle B of title XLVIII of the Atomic Energy Defense Act ([former] 50 U.S.C. 2791 et seq.) made by section 3117 shall be executed with respect to subchapter II of chapter 608 of [title] 10, United States Code, as added by subsection (a).” enhance the safety, security, and reliability of the nuclear weapons stockpile of the United States; modernize the nuclear weapons complex; and maintain the delivery platforms for nuclear weapons. A description of the plan to enhance the safety, security, and reliability of the nuclear weapons stockpile of the United States. A description of the plan to modernize the nuclear weapons complex, including improving the safety of facilities, modernizing the infrastructure, and maintaining the key capabilities and competencies of the nuclear weapons workforce, including designers and technicians. A description of the plan to maintain delivery platforms for nuclear weapons. An estimate of budget requirements, including the costs associated with the plans outlined under subparagraphs (A) through (C), over a 10-year period. the President should maintain the stated position of the United States that the follow-on treaty to the START Treaty not include any limitations on the ballistic missile defense systems, space capabilities, or advanced conventional weapons systems of the United States; the enhanced safety, security, and reliability of the nuclear weapons stockpile, modernization of the nuclear weapons complex, and maintenance of the nuclear delivery systems are key to enabling further reductions in the nuclear forces of the United States; and the President should submit budget requests for fiscal year 2011 and subsequent fiscal years for the programs of the National Nuclear Security Administration of the Department of Energy that are adequate to sustain the needed capabilities to support the long-term maintenance of the nuclear stockpile of the United States.”
Verify at the official source: Federal legislative text
Facing this? Know exactly what happens next.
MOFRD turns this code section into your situation: the deadlines that apply to you, the forms your county uses, and the resolution paths people in your position actually take. Free for 3 days — no card required.
This page is legal information, not legal advice. Code text is sourced from official publications and may lag amendments — always confirm at the official source linked above. Plain-English summaries and relationship data are AI-derived and reviewed on an ongoing basis; verify with a licensed attorney before acting.