California · Public Utilities Code - PUC

PUC §958: (a) Each gas corporation shall prepare and submit to the commission a proposed comprehensive pressure testing implementation plan for all intrastate transmission lines to either pressure test those li

What this law says, in plain English

Gas corporations must prepare and submit a comprehensive pressure testing plan for intrastate transmission lines to the commission.

Read the full statutory text
(a) Each gas corporation shall prepare and submit to the commission a proposed comprehensive pressure testing implementation plan for all intrastate transmission lines to either pressure test those lines or to replace all segments of intrastate transmission lines that were not pressure tested or that lack sufficient details related to performance of pressure testing. The comprehensive pressure testing implementation plan shall provide for testing or replacing all intrastate transmission lines as soon as practicable. The comprehensive pressure testing implementation plan shall set forth criteria on which pipeline segments were identified for replacement instead of pressure testing. (b) The comprehensive pressure testing implementation plan shall include a timeline for completion that is as soon as practicable, and includes interim safety enhancement measures, including increased patrols and leak surveys, pressure reductions, prioritization of pressure testing for critical pipelines that must run at or near maximum allowable operating pressure values that result in hoop stress levels at or above 30 percent of specified minimum yield stress, and any other measure that the commission determines will enhance public safety during the implementation period. Engineering-based assumptions may be used to determine maximum allowable operating pressure in the absence of complete records, but only as an interim measure until such time as all the lines have been tested or replaced, in order to allow the gas system to continue to operate. (c) At the completion of the implementation period, all California natural gas intrastate transmission line segments shall meet all of the following: (1) Have been pressure tested. (2) Have traceable, verifiable, and complete records readily available. (3) Where warranted, be capable of accommodating in-line inspection devices.

Verify at the official source: California legislative text

Facing this? Know exactly what happens next.

MOFRD turns this code section into your situation: the deadlines that apply to you, the forms your county uses, and the resolution paths people in your position actually take. Free for 3 days — no card required.

This page is legal information, not legal advice. Code text is sourced from official publications and may lag amendments — always confirm at the official source linked above. Plain-English summaries and relationship data are AI-derived and reviewed on an ongoing basis; verify with a licensed attorney before acting.