Federal · Title 49 — Transportation

49 U.S.C. § 60109: High-density population areas and environmentally sensitive areas

Read the full statutory text
by operators of gas pipeline facilities, each gas pipeline facility (except a natural gas distribution line) located in a high-density population area; and each hazardous liquid pipeline facility, whether otherwise subject to this chapter, that crosses waters where a substantial likelihood of commercial navigation exists or that is located in an area described in the criteria as a high-density population area; and each hazardous liquid pipeline facility and gathering line, whether otherwise subject to this chapter, located in an area that the Secretary, in consultation with the Administrator of the Environmental Protection Agency, describes as unusually sensitive to environmental damage if there is a hazardous liquid pipeline accident; and provide that the identification be carried out through the inventory required under section 60102(e) of this title . locations near pipeline rights-of-way that are critical to drinking water, including intake locations for community water systems and critical sole source aquifer protection areas; and locations near pipeline rights-of-way that are part of the Great Lakes or have been identified as coastal beaches, certain coastal waters, critical wetlands, riverine or estuarine systems, national parks, wilderness areas, wildlife preservation areas or refuges, wild and scenic rivers, or critical habitat areas for threatened and endangered species. Each operator of a gas pipeline facility shall conduct an analysis of the risks to each facility of the operator located in an area identified pursuant to subsection (a)(1) and defined in chapter 192 of title 49, Code of Federal Regulations, including any subsequent modifications, and shall adopt and implement a written integrity management program for such facility to reduce the risks. Not later than 12 months after the date of enactment of this subsection, the Secretary shall issue regulations prescribing standards to direct an operator’s conduct of a risk analysis and adoption and implementation of an integrity management program under this subsection. The regulations shall require an operator to conduct a risk analysis and adopt an integrity management program within a time period prescribed by the Secretary, ending not later than 24 months after such date of enactment. Not later than 18 months after such date of enactment, each operator of a gas pipeline facility shall begin a baseline integrity assessment described in paragraph (3). The Secretary may satisfy the requirements of this paragraph through the issuance of regulations under this paragraph or under other authority of law. A baseline integrity assessment of each of the operator’s facilities in areas identified pursuant to subsection (a)(1) and defined in chapter 192 of title 49, Code of Federal Regulations, including any subsequent modifications, by internal inspection device, pressure testing, direct assessment, or an alternative method that the Secretary determines would provide an equal or greater level of safety. The operator shall complete such assessment not later than 10 years after the date of enactment of this subsection. At least 50 percent of such facilities shall be assessed not later than 5 years after such date of enactment. The operator shall prioritize such facilities for assessment based on all risk factors, including any previously discovered defects or anomalies and any history of leaks, repairs, or failures. The operator shall ensure that assessments of facilities with the highest risks are given priority for completion and that such assessments will be completed not later than 5 years after such date of enactment. Subject to paragraph (5), periodic reassessments of the facility, at a minimum of once every 7 calendar years, using methods described in subparagraph (A). The Secretary may extend such deadline for an additional 6 months if the operator submits written notice to the Secretary with sufficient justification of the need for the extension. Clearly defined criteria for evaluating the results of assessments conducted under subparagraphs (A) and (B) and for taking actions based on such results. A method for conducting an analysis on a continuing basis that integrates all available information about the integrity of the facility and the consequences of releases from the facility. A description of actions to be taken by the operator to promptly address any integrity issue raised by an evaluation conducted under subparagraph (C) or the analysis conducted under subparagraph (D). A description of measures to prevent and mitigate the consequences of releases from the facility. A method for monitoring cathodic protection systems throughout the pipeline system of the operator to the extent not addressed by other regulations. If the Secretary raises a safety concern relating to the facility, a description of the actions to be taken by the operator to address the safety concern, including issues raised with the Secretary by States and local authorities under an agreement entered into under section 60106. In the case of a baseline integrity assessment conducted by an operator in the period beginning on the date of enactment of this subsection and ending on the date of issuance of regulations under this subsection, the Secretary shall accept the assessment as complete, and shall not require the operator to repeat any portion of the assessment, if the Secretary determines that the assessment was conducted in accordance with the requirements of this subsection. In accordance with section 60118(c), the Secretary may waive or modify any requirement for reassessment of a facility under paragraph (3)(B) for reasons that may include the need to maintain local product supply or the lack of internal inspection devices if the Secretary determines that such waiver is not inconsistent with pipeline safety. The minimum requirements described in paragraph (3). The type or frequency of inspections or testing of pipeline facilities, in addition to the minimum requirements of paragraph (3)(B). The manner in which the inspections or testing are conducted. The criteria used in analyzing results of the inspections or testing. The types of information sources that must be integrated in assessing the integrity of a pipeline facility as well as the manner of integration. The nature and timing of actions selected to address the integrity of a pipeline facility. Such other factors as the Secretary determines appropriate to ensure that the integrity of a pipeline facility is addressed and that appropriate mitigative measures are adopted to protect areas identified under subsection (a)(1). changes to valves or the establishment or modification of systems that monitor pressure and detect leaks based on the operator’s risk analysis; and the use of emergency flow restricting devices. In the absence of regulations addressing the elements of an integrity management program described in this subsection, the operator of a pipeline facility shall conduct a risk analysis and adopt and implement an integrity management program described in this subsection not later than 24 months after the date of enactment of this subsection and shall complete the baseline integrity assessment described in this subsection not later than 10 years after such date of enactment. At least 50 percent of such facilities shall be assessed not later than 5 years after such date of enactment. The operator shall prioritize such facilities for assessment based on all risk factors, including any previously discovered defects or anomalies and any history of leaks, repairs, or failures. The operator shall ensure that assessments of facilities with the highest risks are given priority for completion and that such assessments will be completed not later than 5 years after such date of enactment. The Secretary shall review a risk analysis and integrity management program under paragraph (1) and record the results of that review for use in the next review of an operator’s program. The Secretary may conduct a review under clause (i) as an element of the Secretary’s inspection of an operator. If the Secretary determines that a risk analysis or integrity management program does not comply with the requirements of this subsection or regulations issued as described in paragraph (2), has not been adequately implemented, or is inadequate for the safe operation of a pipeline facility, the Secretary may conduct proceedings under this chapter. In order to facilitate reviews under this paragraph, an operator of a pipeline facility shall notify the Secretary of any amendment made to the operator’s integrity management program not later than 30 days after the date of adoption of the amendment. The Secretary shall review any such amendment in accordance with this paragraph. The Secretary shall provide a copy of each risk analysis and integrity management program reviewed by the Secretary under this paragraph to any appropriate State authority with which the Secretary has entered into an agreement under section 60106. A State authority that enters into an agreement pursuant to section 60106, permitting the State authority to review the risk analysis and integrity management program pursuant to paragraph (9), may provide the Secretary with a written assessment of the risk analysis and integrity management program, make recommendations, as appropriate, to address safety concerns not adequately addressed by the operator’s risk analysis or integrity management program, and submit documentation explaining the State-proposed revisions. The Secretary shall consider carefully the State’s proposals and work in consultation with the States and operators to address safety concerns. Section 60104(b) shall not apply to this section. would provide a greater level of safety than direct assessment of the pipelines; and is feasible. the results of the study under subparagraph (A); and recommendations based on that study, if any. Not later than 4 years after the date of enactment of this subsection, the Comptroller General shall complete an assessment and evaluation of the effects on public safety and the environment of the requirements for the implementation of integrity management programs contained in the standards prescribed as described in subsection (c)(2). Not later than December 31, 2007 , the Secretary shall prescribe minimum standards for integrity management programs for distribution pipelines. In carrying out this subsection, the Secretary may require operators of distribution pipelines to continually identify and assess risks on their distribution lines, to remediate conditions that present a potential threat to line integrity, and to monitor program effectiveness. the service line is installed or entirely replaced after June 1, 2008 ; the service line operates continuously throughout the year at a pressure not less than 10 pounds per square inch gauge; the service line is not connected to a gas stream with respect to which the operator has had prior experience with contaminants the presence of which could interfere with the operation of an excess flow valve; the installation of an excess flow valve on the service line is not likely to cause loss of service to the residence or interfere with necessary operation or maintenance activities, such as purging liquids from the service line; and an excess flow valve meeting performance standards developed under section 60110(e) of title 49 , United States Code, is commercially available to the operator, as determined by the Secretary. Not later than 2 years after the date of enactment of the Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011, and after issuing a final report on the evaluation of the National Transportation Safety Board’s recommendation on excess flow valves in applications other than service lines serving one single family residence, the Secretary, if appropriate, shall by regulation require the use of excess flow valves, or equivalent technology, where economically, technically, and operationally feasible on new or entirely replaced distribution branch services, multifamily facilities, and small commercial facilities. Operators of natural gas distribution systems shall report annually to the Secretary on the number of excess flow valves installed on their systems under subparagraph (A). The Secretary shall determine which distribution pipelines will be subject to the minimum standards. Each operator of a distribution pipeline that the Secretary determines is subject to the minimum standards prescribed by the Secretary under this subsection shall develop and implement an integrity management program in accordance with those standards. Subject to section 60104(c), a State authority having a current certification under section 60105 may adopt or continue in force additional integrity management requirements, including additional requirements for installation of excess flow valves, for gas distribution pipelines within the boundaries of that State. the risks resulting from the presence of cast iron pipes and mains in the distribution system; and the risks that could lead to or result from the operation of a low-pressure distribution system at a pressure that makes the operation of any connected and properly adjusted low-pressure gas burning equipment unsafe, as determined by the Secretary. considers factors other than past observed abnormal operating conditions (as defined in section 192.803 of title 49, Code of Federal Regulations (or a successor regulation)) in ranking risks and identifying measures to mitigate those risks; and may not determine that there are no potential consequences associated with low probability events unless that determination is otherwise supported by engineering analysis or operational knowledge. the distribution integrity management plan of the operator; the emergency response plan under section 60102(d)(5); and the procedural manual for operations, maintenance, and emergencies under section 60102(d)(4). Each operator of a distribution system shall make available to the Secretary or make available for inspection to the relevant State authority described in clause (i), if applicable, an updated plan or manual described in that clause by not later than 60 days after the date of a significant update, as determined by the Secretary. Nothing in this subsection shall be construed to authorize the disclosure of any information that is exempt from disclosure under section 552(b) of title 5 . Not later than 2 years after the date of promulgation of the regulations under subparagraph (A), and not less frequently than once every 5 years thereafter, the Secretary or relevant State authority with a certification in effect under section 60105 shall review the distribution integrity management plan, the emergency response plan, and the procedural manual for operations, maintenance, and emergencies of each operator of a distribution system and record the results of that review for use in the next review of the program of that operator. shall not use subclause (I) as justification to reduce funding, decertify, or penalize in any way under section 60105, 60106, or 60107 a State authority that has in effect a certification under section 60105 or an agreement under section 60106; and submit to the Committee on Commerce, Science, and Transportation of the Senate and the Committees on Transportation and Infrastructure and Energy and Commerce of the House of Representatives a list of States found to be noncompliant with subclause (I) during the annual program evaluation; and provide a written notice to each State authority described in item (aa) that is not in compliance with the requirements of subclause (I). on significant change to the plans or procedural manual, as applicable; on significant change to the gas distribution system of the operator, as applicable; and not less frequently than once every 5 years. The Secretary may conduct a review under clause (i) or (ii) as an element of the inspection of the operator carried out by the Secretary. If the Secretary determines that the documents reviewed under clause (i) or (ii) do not comply with the requirements of this chapter (including regulations to implement this chapter), have not been adequately implemented, or are inadequate for the safe operation of a pipeline facility, the Secretary may conduct proceedings under this chapter. the signing officer has reviewed the report; and to the best of such officer’s knowledge and belief, the report is true and complete. using internal inspection technology appropriate for the integrity threat are completed not less often than once every 12 months; and using pipeline route surveys, depth of cover surveys, pressure tests, external corrosion direct assessment, or other technology that the operator demonstrates can further the understanding of the condition of the pipeline facility are completed on a schedule based on the risk that the pipeline facility poses to the high consequence area in which the pipeline facility is located, but not less often than once every 12 months. that is not an offshore pipeline facility; and any portion of which is located at depths greater than 150 feet under the surface of the water. For purposes of this subsection, the term “high consequence area” has the meaning given that term in section 195.450 of title 49, Code of Federal Regulations. The Secretary shall conduct inspections under section 60117(d) to determine whether each operator of a pipeline facility to which this subsection applies is complying with this section. In carrying out this subsection, each operator shall implement procedures that assess potential impacts by maritime equipment or other vessels, including anchors, anchor chains, or any other attached equipment. review all comments submitted in response to the advance notice of proposed rulemaking entitled ‘Pipeline Safety: Class Location Change Requirements’ (83 Fed. Reg. 36861 ( July 31, 2018 )); to make a determination whether to publish a notice of proposed rulemaking; and if a positive determination is made under subparagraph (A), to advance in the rulemaking process, including by taking any actions required under section 60115 of title 49 , United State Code; and consider the issues raised in the report to Congress entitled ‘Evaluation of Expanding Pipeline Integrity Management Beyond High-Consequence Areas and Whether Such Expansion Would Mitigate the Need for Gas Pipeline Class Location Requirements’ prepared by the Pipeline and Hazardous Materials Safety Administration and submitted to Congress on June 8, 2016 , including the adequacy of existing integrity management programs. Nothing in this section may be construed to require the Administrator of the Pipeline and Hazardous Materials Safety Administration to publish a notice of proposed rulemaking or otherwise continue the rulemaking process with respect to the advance notice of proposed rulemaking described in subsection (a)(1). For purposes of this section, the requirements of section 106 [ 134 Stat. 2220 ] shall apply during the period beginning on the date that is 180 days after the date of enactment of this Act and ending on the date on which the requirements of subsection (a) are completed.” the territorial sea of the United States; the Great Lakes and their connecting waters; and the marine and estuarine waters of the United States up to the head of tidal influence. The term ‘coastal beach’ means any land between the high- and low-water marks of certain coastal waters. The Secretary of Transportation shall revise section 195.6(b) of title 49, Code of Federal Regulations, to explicitly state that the Great Lakes, coastal beaches, and certain coastal waters are USA ecological resources for purposes of determining whether a pipeline is in a high consequence area (as defined in section 195.450 of such title).” whether integrity management system requirements, or elements thereof, should be expanded beyond high-consequence areas; and with respect to gas transmission pipeline facilities, whether applying integrity management program requirements, or elements thereof, to additional areas would mitigate the need for class location requirements. The continuing priority to enhance protections for public safety. The continuing importance of reducing risk in high-consequence areas. The incremental costs of applying integrity management standards to pipelines outside of high-consequence areas where operators are already conducting assessments beyond what is required under chapter 601 of title 49, United States Code. The need to undertake integrity management assessments and repairs in a manner that is achievable and sustainable, and that does not disrupt pipeline service. The options for phasing in the extension of integrity management requirements beyond high-consequence areas, including the most effective and efficient options for decreasing risks to an increasing number of people living or working in proximity to pipeline facilities. The appropriateness of applying repair criteria, such as pressure reductions and special requirements for scheduling remediation, to areas that are not high-consequence areas. expansion of integrity management requirements, or elements thereof, beyond high-consequence areas; and with respect to gas transmission pipeline facilities, whether applying the integrity management program requirements, or elements thereof, to additional areas would mitigate the need for class location requirements. The Secretary shall collect any relevant data necessary to complete the evaluation required by subsection (a). the date that is 1 year after the date of completion of the report under subsection (c); or the date that is 3 years after the date of enactment of this Act. In order to provide Congress the necessary time to review the results of the report required by subsection (c) and implement appropriate recommendations, the Secretary shall not, during the review period, issue final regulations described in paragraph (3)(B). integrity management system requirements, or elements thereof, should be expanded beyond high-consequence areas; and with respect to gas transmission pipeline facilities, applying integrity management program requirements, or elements thereof, to additional areas would mitigate the need for class location requirements. expand integrity management system requirements, or elements thereof, beyond high-consequence areas; and remove redundant class location requirements for gas transmission pipeline facilities that are regulated under an integrity management program adopted and implemented under section 60109(c)(2) of title 49 , United States Code. Notwithstanding any other provision of this subsection, the Secretary, during the review period, may issue final regulations described in paragraph (3)(B), if the Secretary determines that a condition that poses a risk to public safety, property, or the environment is present or an imminent hazard exists and that the regulations will address the risk or hazard. In subparagraph (A), the term ‘imminent hazard’ means the existence of a condition related to pipelines or pipeline operations that presents a substantial likelihood that death, serious illness, severe personal injury, or substantial endangerment to health, property, or the environment may occur. whether risk-based reassessment intervals are a more effective alternative for managing risks to pipelines in high-consequence areas once baseline assessments are complete when compared to the reassessment interval specified in section 60109(c)(3)(B) of title 49 , United States Code; the number of anomalies found in baseline assessments required under section 60109(c)(3)(A) of title 49 , United States Code, as compared to the number of anomalies found in reassessments required under section 60109(c)(3)(B) of such title; and the progress made in implementing the recommendations in GAO Report 06–945 and the current relevance of those recommendations that have not been implemented.”

Verify at the official source: Federal legislative text

Facing this? Know exactly what happens next.

MOFRD turns this code section into your situation: the deadlines that apply to you, the forms your county uses, and the resolution paths people in your position actually take. Free for 3 days — no card required.

This page is legal information, not legal advice. Code text is sourced from official publications and may lag amendments — always confirm at the official source linked above. Plain-English summaries and relationship data are AI-derived and reviewed on an ongoing basis; verify with a licensed attorney before acting.