Federal · Title 10 — Armed Forces

10 U.S.C. § 2801: Scope of chapter; definitions

Read the full statutory text
The term “military construction” as used in this chapter or any other provision of law includes any construction, development, conversion, or extension of any kind carried out with respect to a military installation, whether to satisfy temporary or permanent requirements, or any acquisition of land or construction of a defense access road (as described in section 210 of title 23 ). A military construction project includes all military construction work, or any contribution authorized by this chapter, necessary to produce a complete and usable facility or a complete and usable improvement to an existing facility (or to produce such portion of a complete and usable facility or improvement as is specifically authorized by law). The term “appropriate committees of Congress” means the congressional defense committees and, with respect to any project to be carried out by, or for the use of, an intelligence component of the Department of Defense, the Permanent Select Committee on Intelligence of the House of Representatives and the Select Committee on Intelligence of the Senate. The term “facility” means a building, structure, or other improvement to real property. The term “life-cycle cost-effective”, with respect to a project, product, or measure, means that the sum of the present values of investment costs, capital costs, installation costs, energy costs, operating costs, maintenance costs, and replacement costs, as estimated for the lifetime of the project, product, or measure, does not exceed the base case (current or standard) for the practice, product, or measure. The term “military installation” means a base, camp, post, station, yard, center, or other activity under the jurisdiction of the Secretary of a military department or, in the case of an activity in a foreign country, under the operational control of the Secretary of a military department or the Secretary of Defense, without regard to the duration of operational control. The term “Secretary concerned” includes the Secretary of Defense with respect to matters concerning the Defense Agencies. This chapter (other than sections 2830, 1 2835, and 2836 of this chapter) does not apply to the Coast Guard or to civil works projects of the Army Corps of Engineers. 1 See References in Text note below. Except as provided in subsection (b), the amendments made by this Act [see Short Title of 1982 Amendment note below] shall take effect on October 1, 1982 , and shall apply to military construction projects, and to construction and acquisition of military family housing, authorized before, on, or after such date. The amendment made by section 4 [amending section 138(f)(1) [now 114(b)] of this title] shall apply with respect to funds appropriated for fiscal years beginning after September 30, 1983 .” have not been privatized or transferred pursuant to a conveyance under section 2688 of title 10 , United States Code; and are located on a military installation (as defined in section 2801 of such title). Beginning on February 1 of the year immediately following the date on which the plan under subsection (a) is submitted, and annually thereafter, the Secretary of Defense, in coordination with each Secretary of a military department, shall submit to the Committees on Armed Services of the Senate and the House of Representatives a consolidated report on the condition of critical infrastructure systems owned by the Federal Government located at military installations. For the five-year period preceding the date of submission of the report, all instances of noncompliance of such system with any applicable Federal or State law or regulation, including information on any prior or current consent order or equivalent compliance agreement with any Federal or State regulatory agency. The year of original installation of critical infrastructure system components, including treatment facilities, pump stations, and storage tanks. The average age of distribution system piping and wiring. The rate of system recapitalization, represented as an annual percentage replacement rate of all critical infrastructure system assets. For the one-year period preceding the date of submission of the report, the percentage of key system operational components (including fire hydrants, valves, and backflow preventors) inspected and determined through testing to be fully operational. For the one-year period preceding the date of submission of the report, the absolute number, and a normalized measure for comparative purposes, of all unplanned system outages. For the one-year period preceding the date of submission of the report, the absolute duration, and a normalized measure for comparative purposes, of all unplanned system outages. For the one-year period preceding the date of submission of the report, the absolute number, and a normalized measure for comparative purposes, of all critical infrastructure system main breaks and leaks. The ability to maintain compliance with applicable current and proposed State regulations and standards and applicable regulations and policies of the Department of Defense and the military departments related to each critical infrastructure system described in paragraph (1), and the ability to operate critical infrastructure systems in accordance with accepted industry standards. The ability to maintain a consistent and compliant supply of water for current and projected future installation needs based on current and projected source water availability and quality, including an assessment of source water contamination risks for each critical infrastructure system described in paragraph (1). The ability of each critical infrastructure system described in paragraph (1) to withstand severe weather events, including drought, flooding, and temperature fluctuations. The ability for utility industrial controls systems for each critical infrastructure system described in paragraph (1) to maintain compliance with applicable current and proposed cybersecurity standards and regulations. A report under this subsection shall be submitted in an unclassified form but may contain a classified annex. In this section, the term ‘critical infrastructure system’ includes a transportation infrastructure system and a utilities infrastructure system.” The Secretary of Defense shall conduct a pilot program to evaluate the usefulness of reserving a portion of the military construction funds of the military departments to help the combatant commands satisfy their military construction priorities in a timely manner. The Secretary of Defense shall conduct the pilot program for the benefit of the United States Indo-Pacific Command in the area of responsibility of the United States Indo-Pacific Command. For each fiscal year during which the pilot program is conducted, the Secretary of Defense shall reserve to carry out military construction projects under the pilot program an amount equal to 10 percent of the total amount authorized to be appropriated for military construction projects by titles XXI, XXII, and XXIII of the Military Construction Authorization Act for that fiscal year. The Secretary of Defense shall commence the pilot program no later than October 1, 2023 . The Secretary may commence the pilot program as early as October 1, 2022 , if the Secretary determines that compliance with the reservation of funds requirement under subsection (c) is practicable beginning with fiscal year 2023. The pilot program shall be in effect for the fiscal year in which the Secretary commences the pilot program, as described in paragraph (1), and the subsequent two fiscal years. Any construction commenced under the pilot program before the expiration date may continue to completion. an evaluation of the likely positive and negative impacts were the pilot program extended or made permanent and, if extended or made permanent, the likely positive and negative impacts of expansion to cover all or additional combatant commands; and the recommendations of the Secretary regarding whether the pilot program should be extended or made permanent and expanded.” The Secretary of Defense shall issue modifications to all relevant construction and facilities specifications to ensure that machine room-less elevators (MRLs) are not prohibited in buildings and facilities throughout the Department of Defense, including modifications to the Unified Facilities Guide Specifications (UFGS), the Naval Facilities Engineering Command Interim Technical Guidance, and the Army Corps of Engineers Engineering and Construction Bulletin. In addition to the modifications required under subsection (a), the Secretary may issue further modifications to conform generally with commercial best practices as reflected in the safety code for elevators and escalators as issued by the American Society of Mechanical Engineers. The Secretary shall promulgate interim MRL standards not later than 180 days after the date of the enactment of this Act [ Dec. 12, 2017 ], and shall issue final and formal MRL specifications not later than 1 year after the date of the enactment of this Act. Not later than 1 year after the date of the enactment of this Act, the Secretary shall issue a report to the congressional defense committees [Committees on Armed Services and Appropriations of the Senate and the House of Representatives] on the integration and utilization of MRLs, including information on quantity, location, problems, and successes.”

Verify at the official source: Federal legislative text

Facing this? Know exactly what happens next.

MOFRD turns this code section into your situation: the deadlines that apply to you, the forms your county uses, and the resolution paths people in your position actually take. Free for 3 days — no card required.

This page is legal information, not legal advice. Code text is sourced from official publications and may lag amendments — always confirm at the official source linked above. Plain-English summaries and relationship data are AI-derived and reviewed on an ongoing basis; verify with a licensed attorney before acting.